How to choose the transfer dispatch method for pv analysis?
Hi all,
I'm just starting learning PSS/E. I'd like to have your suggestions for doing PV-analysis. Although I've viewed all the relevant posts in this forum I still have problems.
For drawing a pv-curve by hand, I can do it in this way; selecting the interested load bus then increasing/decreasing the Pload at the bus by keeping a constant power factor.
I don't know how to select the "transfer dispatch methods" in PSS/E since I don't need to select this when I do the pv analysis by hand. I don't know what are the differences between those transfer dispatch methods.
Thank you