How PV analysis work?

asked 2013-04-18 08:51:42 -0500

Cao Huy gravatar image

Hi. I'm trying to draw PV curves by PSSE. But I don't understand the transfer dispatch method even I've read PSSE manual. When I tried to run PV analysis, it returned "No participating dispatch buses in opposing system."

Can you explain for me how the PV analysis work and the principle of transfer dispatch method? What buses' requiements that source subsystem and sink subsystem need? Thank in advance.

edit retag flag offensive close merge delete

3 answers

Sort by ยป oldest newest most voted
1

answered 2014-04-02 22:32:55 -0500

jconto gravatar image

updated 2014-04-02 22:35:04 -0500

Towana,

First, check the basecase to identify in the bus table how bus grouping can be made by selecting areas, zones or owners definition. Next, auxiliary files (*.sub, *.con, *.mon) will have to created to make a , *.dfx file. The *.sub file will contain the bus grouping definition. Check the PSSe manual for details. Then open the PV engine in Psse and fill up entries to create a *.dfx file and next select the source and sink regions by selecting bus grouping defined in the *.sub file for each source and sink. Demo auxliary files are in the 'Example' folder of the PSSe installation. Check the post "Can anybody help me with PV analysis in PSSE please?" and download the python files to run a script-based PV study.

edit flag offensive delete link more
1

answered 2013-04-26 19:04:58 -0500

EBC gravatar image

Hi Cao, in power transfer analysis, the source system (zone/group of zones or an area/group of areas or a group of buses with generation) would increase their generation as you transfer power. At the same time, the sink or opposing system (zone/group of zones or an area/group of areas or a group of buses with generation) would decrease their generation output. In PSS/E, the source and sink (opposing system) must be defined before the power transfer is conducted.

As the program transfer power from the source to the sink, it also monitors bus voltages depending on how the user provided limits so when the power flow solution is not solving or diverging or when the voltage lower limit is hit by the power transfer, the power transfer solution/simulation stops.

edit flag offensive delete link more
0

answered 2014-03-29 12:38:12 -0500

Towana gravatar image

how we can define source and sink? at which step?

edit flag offensive delete link more

Comments

i have the same question , please if you got the answer share it with us

MAJID gravatar imageMAJID ( 2017-04-14 19:07:21 -0500 )edit

Your Answer

Please start posting anonymously - your entry will be published after you log in or create a new account.

Add Answer

[hide preview]

Question Tools

Stats

Asked: 2013-04-18 08:51:42 -0500

Seen: 4,882 times

Last updated: Apr 02 '14