2021-04-29 07:59:26 -0500 received badge  Famous Question (source)
2021-04-07 11:05:38 -0500 commented answer PV analysis .sub file

but later I increased the load manually and I was able to increase even up to 600 MW without problem

2021-04-07 11:05:16 -0500 commented answer PV analysis .sub file

Yes thats what I selected, PV worked for me after inserting some generation at sink zone, but I got another issue, where the PV analysis is not really reflecting how much power can certain zone handle before it collapses. Where, the PV stopped increasing at 250MW.. continue next comment.

2021-04-07 01:41:49 -0500 received badge  Notable Question (source)
2021-04-06 10:44:51 -0500 commented answer PV analysis .sub file

Yes now it works for me, but I got another issue, where the PV analysis is not really reflecting how much power can certain zone handle before it collapses. Where, the PV stopped increasing at 250MW, but later I increased the load manually and I was able to increase even up to 600 MW without problem

2021-04-06 08:56:15 -0500 received badge  Popular Question (source)
2021-04-06 07:54:09 -0500 commented answer PV analysis .sub file

Maybe my understanding is wrong, but why would we need to reduce generation from sink side? We just want to examine how much power can be delivered to specific substation, wh ْ.ْ ile increasing its power until we face voltage collapse, this is the definition of PV analysis right?

2021-04-06 07:34:33 -0500 commented answer PV analysis .sub file

No my sink does not have any generators, I think sink represents the load bus, which I want to increase its power. While source should contain the generators? Is my understanding correct?

2021-04-05 22:41:14 -0500 commented answer PV analysis .sub file

Please refer to above answer, as it is not possible to reply here as a comment

2021-04-05 22:36:57 -0500 answered a question PV analysis .sub file

Yes I used the same zone number as the load, but still facing same problem. Please find below .sub file:

Subsystem SOURCE
Zone 911
end
Subsystem SINK
Zone 221
end
Subsystem 132_Network
JOIN Group1
Area 8
Owner 433
end
end
Subsystem my_network
JOIN Group2
Area 9
Owner 443
end
end
Subsystem Yoga_plant
BUS 772
BUS 777
BUS 782
end
Subsystem Moka_plant
BUS 622
BUS 627
BUS 632
end
end
2021-04-05 13:10:30 -0500 asked a question PV analysis .sub file

I am trying to perform PV analysis but I am getting error: Messages for api PVENGINE1A No participating dispatch busses in opposing system "SINK" {000189}. I already defined a source and a sink in my .sub file but still I have the same problem. I tried to use in sink an existing area and it works, but I don't want to increase the load of this area, instead I want to increase the load of specific Zone, but I am facing this issue. Please help

2021-02-27 16:48:07 -0500 received badge  Famous Question (source)
2021-02-26 04:16:49 -0500 received badge  Notable Question (source)
2021-02-25 15:02:54 -0500 received badge  Famous Question (source)
2021-02-25 10:42:11 -0500 received badge  Famous Question (source)
2021-02-24 08:49:10 -0500 received badge  Popular Question (source)
2021-02-24 06:22:23 -0500 received badge  Notable Question (source)
2021-02-24 06:22:23 -0500 received badge  Popular Question (source)
2021-02-22 05:55:12 -0500 commented answer Case convergence problem

I tried, still same problem

2021-02-22 01:38:27 -0500 commented answer PSSE Crashing in dynamic

- Yes I solved the power flow and it converges - yes still crashes even if I don’t delete dyre data

2021-02-21 22:00:22 -0500 asked a question Case convergence problem

Hello, I have problem with my case, where it is not really converging at all. could you please help me by listing the possible causes which lead to non-convergence of a case, e.g. I heard that reaching reactive generation limit is one of the reasons for non-convergence of the case.

2021-02-21 21:55:52 -0500 asked a question PSSE Crashing in dynamic

Hello.. I am using PSSE to perform dynamic simulation, the simulation was working perfectly for me, but I tried to delete some sub-systems from the network, and in parallel I have deleted from .dyr file the corresponding dynamic data. After doing so, I had issue while running the dynamic in PSSE, where when I try to initialize the dynamic case, the PSSE crashes. could you please help me or at least state the possible causes for this problem. Note: I have deleted only the busses from particular subsystem along with corresponding dynamic data. I did not make any other changes.

2021-02-15 15:04:38 -0500 received badge  Notable Question (source)
2021-02-14 21:40:21 -0500 received badge  Popular Question (source)
2021-02-13 21:37:58 -0500 asked a question Determination the number of islands

Actually, I am trying to run N-1 contingency on my network, and determine maximum number of substations that will be islanded within same radial connection, for example, in case of single line tripping, 4 substations are islanded. Then another line tripping causes 5 substations (previous 4 substations + 1 additional substation) to be islanded. I want to identify the line that will cause 5 substations to be islanded. I tried to use the API: Treedat(), but I was not really capable to meet my requirement.