2024-02-29 11:36:24 -0500 | answered a question | Is REGFM_A1 model available in PSSE? Yes, starting in version 36.0.0, the REGFM_A1 model is included with PSS/E. |
2023-01-07 00:05:23 -0500 | received badge | ● Famous Question (source) |
2023-01-07 00:05:23 -0500 | received badge | ● Notable Question (source) |
2023-01-05 10:55:19 -0500 | received badge | ● Popular Question (source) |
2023-01-04 17:58:44 -0500 | commented answer | REGC_A (REGCA1) network non-convergence for close-in faults The only location I've been able to find discussion of numerical instability related to Lvpnt0 is here (https://www.nerc.com/comm/PC/LoadModelingTaskForceDL/Reliability_Guideline_-_DER_Modeling_Parameters_-_2017-04-04_-_FINAL_DRAFT.pdf). Do you know of anywhere else this is discussed? |
2023-01-04 17:58:15 -0500 | commented answer | REGC_A (REGCA1) network non-convergence for close-in faults Raising Lvpnt0 and Lvpnt1 to 0.4 and 0.8, respectively (default values for these) and adding some fault impedance achieves convergence... |
2023-01-04 17:56:58 -0500 | commented answer | REGC_A (REGCA1) network non-convergence for close-in faults I have determined that the non-convergence is in large part being caused by the low voltage active current management functionality, specifically the Lvpnt0 parameter, which was set to 0.01. |
2023-01-04 12:58:53 -0500 | received badge | ● Editor (source) |
2023-01-04 12:53:56 -0500 | asked a question | REGC_A (REGCA1) network non-convergence for close-in faults Hello everyone, I am performing a renewable impact study, and as part of this study, we must simulate faults nearby the proposed wind farm. The wind farm uses the following WECC generic models, and we're observing numerical instability (network non-convergence) when the fault is applied for the entire duration of the fault, even when significant fault impedance is added: REGCA1 REECA1 WTDTA1 WTPTA1 WTARA1 REPCTA1 WTTQA1 The faults we are simulating do not completely isolate the wind farm from the rest of the network. Despite this, we are having the network non-convergence issues. We've tried several approaches to fix this problem but nothing seems to work. These include:
Does anyone have experience with diagnosing network non-convergence/numerical instability issues with the 2nd generation generic renewable models? I'm sure there's a way to achieve convergence with these models, and to truly simulate a "bolted" fault near (one or two buses away from) the new wind facility, but we haven't found a good solution so far. Thanks for any and all help. |