How to create a N-1 generator contingency list that enumerates every single generator in a subsystem?
Hello everyone,
I wanted to create a N-1 generator contingency list that enumerates every single generator in a subsystem in PSS\E GUI. But when creating .con file, the only relevant option "single contingency" just create a single branch contingency list for me. I don't know why it doesn't also give me a single generator contingency list. Did I miss checking some options while creating .con file?
After searching one manual called "POM.pdf", I found a useful command "SINGLE MACHINE IN SUBSYSTEM 'SUBSYSNAME' ". But the problem is that it only trip the generator with largest capacity in each bus in the specific subsystem, not tripping every single generator as I wanted.
Does anyone happen to know how to fix this problem?
Your advice and comment would be greatly appreciated. Sincerely, -YP