Hi Rimux or anyone willing to help me out:

To avoid posting too many comments under you previous answer, I would like another contingency analysis question in here. Right now, I am trying to run ACCC for a whole N-1 contingency list (i.e. enumerate every single branch and every single generator in a specified subsystem), first I have problem creating a full single generator contingency list (I already asked this question in another separate thread, but if you know the answer, you are welcome to share you answer here:-). Secondly, since generator failure might cause generation-load-unbalance, I need to make proportional adjustment to all other online generators. So after finishing the whole Contingency analysis (including both branch and generator contingencies), I can only fetch all contingency labels through solu.colabel and decide the if a specific contingency is a branch one or a generator one, by searching keywork "SINGLE" (branch) or "UNIT"(generator). But I wonder if there is a easier way to identify a generator contingency. Also, do you know a way to do "proportional adjustment" to online generator's current dispatch which should be decided by a base case power flow run (correct?)?

Sorry for asking so many trivial questions at the same time. Please let me know if any part of my question is not clear to you. I would love to clarify further.

Thanks very much again!