Ask Your Question

Revision history [back]

click to hide/show revision 1
initial version

Integration of wind generation in Nordic-32 system

While integrating wind generation by extending the bus results in many of the generating units reaching their reactive limit, after power flow codes of generators changed to -2. Can anyone guide me in this? Without integration load flow is running fine. I want to do the dynamic study by integrating the renewables and storage in the system.