FLAT run test of PV plant
Hi, can some help me to understand how to perform FLAT run test in PSSE for PV plant .?
Hi, can some help me to understand how to perform FLAT run test in PSSE for PV plant .?
A flat run test is always a dynamic simulation without any disturbance. Just initialize and run. It is used to test the small signal stability of the models.
There are several questions here on how to perform a dynamic simulation, read them and learn.
i am following these steps to perform flat run *load .sav * run load flow *load .dyr file *channel set up *intialise for 0.0167 * run for 10 sec . let me know any thing wrong in procedure . voltage profile looking good , mean constant line but reactive power change in step ,#perolofl
try dmview