Minh Ngoc's profile - activity

2018-11-06 08:57:32 -0500 received badge  Notable Question (source)
2018-11-06 08:57:32 -0500 received badge  Popular Question (source)
2018-08-31 02:02:32 -0500 received badge  Famous Question (source)
2018-07-29 20:12:16 -0500 asked a question HVDCPLU1 Parameter

Dear all ! Can you help me find some example the parameter of HVDCPLU1 ( steady state, dynamic) for VSC ?

Thank you so much

2018-06-14 08:10:07 -0500 commented answer network not converged in wind farm

Thank you so much, my problem from not change remote control in dynamic parameter of electrical wind turbine. Thank you so much

2018-06-10 14:19:06 -0500 received badge  Notable Question (source)
2018-06-07 06:41:46 -0500 answered a question 2 VSC terminals

Can you talk clearly?

2018-06-04 20:41:55 -0500 received badge  Popular Question (source)
2018-06-04 10:49:19 -0500 commented answer network not converged in wind farm

Thank you so much, Yes after fault clearing.

2018-06-04 10:47:58 -0500 commented answer network not converged in wind farm

Thank you so much. I have check it is better than, However when i add exciter dynamic is show that CONTROL WT4E2 AT BUS 105 MACHINE 1 NUMBER OF INTERNAL DC LINK ITERATIONS EXCEEDS 100 and feedback the result NaN

2018-06-04 04:42:12 -0500 answered a question network not converged in wind farm

Yes. Thank you so much.

I after clear fault have the situation during nearly 0,5 - 1 second network not converged. After that parameter show NaN value.

2018-06-04 00:52:44 -0500 asked a question network not converged in wind farm

Dear! I am using pss/e 33. i have been run power system connect with wind farm via HVDC VSC. However system is show Network not converged when simulation one faults in power system. Can you give me some suggest for this situation? Thank you.

2018-06-01 06:24:21 -0500 received badge  Enthusiast
2018-05-28 23:52:20 -0500 commented answer Dynamic simulations using Python

Thank you so much