If the system is the following: 999 SLACK BUS 10 POI 9 HVTRANSFORMERLEVEL 8 MVTRANSFORMERLEVEL There is a interconnection line between 9 and 10.
The PCC is regulating at 10 and the droop compensation is activated with Kc=0.05.
In REPCA model ICON: M=10 But which line should be monitorized? M+1=10 M+2=999 Or M+1=999 M+2=10