1 | initial version |
i posed a overload criteria for PV analysis engine, and when the process is finished, i checked the progress report at Output bar to see at which step the engine has stopped, but unfortunately it doesn't give enough information;in my cas it gives only the number of branch out of overload criteria( for my cas 6 branches), the question is there any way to determine this branches names or codes ? thanks in advance
2 | No.2 Revision |
Hi every one, i posed a overload criteria for PV analysis engine, and when the process is finished, i checked the progress report at Output bar to see at which step the engine has stopped, but unfortunately it doesn't give enough information;in my cas it gives only the number of branch out of overload criteria( for my cas 6 branches), the question is there any way to determine this branches names or codes ? thanks in advance