First time here? We are a friendly community of Power Systems Engineers. Check out the FAQ!

Ask Your Question
0

TIOCR1 model for monitoring line current and shedding a load at a certain bus after a certain current threshold

asked Aug 26 '1

abdul gravatar image

I am using TIOCR1 line relay model for monitoring the line current and shedding the load at a particular bus after the certain line current (pu) threshold is reached.

I have defined bus number and bus ID in ICON(M+1) and ICON(M+2). I have also set ICON(M) to 1 (monitor and operation). However, the model does not shed the load despite the current reaching the threshold value. What am I missing?

1 answer

Sort by » oldest newest most voted
0

answered Aug 26 '1

perolofl gravatar image

Try to add the model to savnw case and present the model data in this forum. As it is now it is difficult to nail down the problem.

link

Your Answer

Please start posting anonymously - your entry will be published after you log in or create a new account.
Want to format code in your answer? Here is a one minute demo on Youtube

Add Answer

[hide preview]

Question Tools

1 follower

Stats

Asked: Aug 26 '1

Seen: 473 times

Last updated: Aug 26 '21