Integration of wind generation in Nordic-32 system

asked 2018-06-12 09:24:08 -0500

PRIYANKA gravatar image

While integrating wind generation by extending the bus results in many of the generating units reaching their reactive limit, after power flow codes of generators changed to -2. Can anyone guide me in this? Without integration load flow is running fine. I want to do the dynamic study by integrating the renewables and storage in the system.

edit retag flag offensive close merge delete

Comments

Can you solve the load flow after adding the wind generation?

perolofl gravatar imageperolofl ( 2018-06-12 17:21:00 -0500 )edit

Yes, I am able to run load flow resulted in some mismatch at some far bus from the place where wind is integrated.

PRIYANKA gravatar imagePRIYANKA ( 2018-06-13 00:23:23 -0500 )edit

When I am integrating 20% wind generation connecting the machines at buses where neither machine nor load is connected earlier. All machine code goes to -2 after load flow. After this, I am not able to go for dynamic analysis as while going for switching studies pss/e stopped working.

PRIYANKA gravatar imagePRIYANKA ( 2018-06-13 05:34:59 -0500 )edit

Do you mean that all wind nodes go to code -2 or all machine nodes in the system?

perolofl gravatar imageperolofl ( 2018-06-13 15:41:02 -0500 )edit

more than 50% of machines including wind is going to -2. 1/3 wind unit is reaching this limit. Just want to know which parameter needs to be modified to get the desired outcome. When I am changing an angle and voltage PU of the buses whr Wind is connected, there occurs some change in power mismatch.

PRIYANKA gravatar imagePRIYANKA ( 2018-06-14 00:53:08 -0500 )edit

How many MW wind power have you added and how did you compensate for the increased generation? Is the swing bus generator overloaded?

perolofl gravatar imageperolofl ( 2018-06-14 07:04:26 -0500 )edit

Penetration of wind is 20%. No extra compensation is done. I thought the generator would adjust their generation on their own. What compensating devices can be added to meet the system requirement.

PRIYANKA gravatar imagePRIYANKA ( 2018-06-14 08:19:01 -0500 )edit

So how many MW are 20%???? You have to make a rough active power balancing yourself before solving. The swing bus will take care of the rest. In your case I guess too high burden is laid on the swing...

perolofl gravatar imageperolofl ( 2018-06-14 08:32:09 -0500 )edit

Thr is another prob while running LF using full newton raphson method, each time outcome is diff. Wid flat start & don't flat start result differs each time wid same data. Cn u plz guide with this. Sometimes LF converges very fast with 0MW mismatch and no violation, sometimes its show some mismatch