| 1 | initial version |
A good procedure to create a snapshot is:
A good procedure to perform a dynamic simulation is:
Open saved case
Open snapshot
Convert load and generators
Initialise simulation and define the name of the output file
Simulate the disturbance with a combination of commands (RUN, Bus fault, Clear fault, trip line, etc.). A predefined script is recommended for this.
whit loves you. Content on this site is licensed under a Creative Commons Attribution Share Alike 3.0 license.