| 1 | initial version |
There is nothing strange here. There are no P limits at a swing bus. The swing bus will supply the power necessary to maintain the active power balance in the system, i.e. the total generation = total consumtion + losses.
You have to increase PGEN for some type 2 generator nodes with at least 200 MW and solve again. Or decrease the load with 200 MW.
See also post "Swing Bus Negative Active Power".
whit loves you. Content on this site is licensed under a Creative Commons Attribution Share Alike 3.0 license.