Ask Your Question

Revision history [back]

click to hide/show revision 1
initial version

is the load in the sink. After the sink load is incremented, a load flow solution will set the total output of the generation in the source, while the swing generator would take care of the losses. Now the base case is in a more loaded state. At his point contingencies are applied, load flow solved and monitored buses would have their voltage recorded. The process repeats until the source reached its maximum capacity to export power or the load flow does not solve, signaling that a potential voltage collapse has been uncovered.

is the load in the sink. After the sink load is incremented, a load flow solution will set the total output of the generation in the source, while the swing generator would take care of the losses. Now the base case is in a more loaded state. At his point contingencies are applied, load flow solved and monitored buses would have their voltage recorded. The process repeats until the source reached its maximum capacity to export power or the load flow does not solve, signaling that a potential voltage collapse has been uncovered.uncovered. PSSE migth use linear factors techniques to accelerate computations of each contingency.