| 1 | initial version |
Parameters db1 and err specify the first dead band. Input signal is always in pu speed deviation.
Parameter db2 specifies a hysteresis in pu gate position. If none enter 0.
Parameters GV and Pgv represent a conversion from pu gate position to pu turbine power.
| 2 | No.2 Revision |
Parameters db1 and err specify the first dead band. Input signal is always in pu speed deviation.
Parameter db2 specifies a hysteresis in pu gate valve position. If none enter 0.
Parameters GV and Pgv represent a conversion from pu gate valve position to pu turbine power.
whit loves you. Content on this site is licensed under a Creative Commons Attribution Share Alike 3.0 license.