answered Sep 26 '16

perolofl gravatar image

You don't need any extra bus or circuit breaker. It is only to switch on the load at the generator flag with the status flag and then switch it off again at a proper time in the simulation.

click to hide/show revision 2
No.2 Revision

You don't need any extra bus or circuit breaker. It is only to switch on the load at the generator flag bus with the status flag and then switch it off again at a proper time in the simulation.