a) All generators connected to a bus use the same Plant data, i.e. same voltage setpoint.

b) Assign same Vsched to both generators. PSSE will use Vsched of the first generator if Vsched are not the same.

e) The remote bus should be electrically nearby. If not, there will be transfer of reactive power and voltage drops in the network.

The best is to test by yourself and see the result.