First time here? We are a friendly community of Power Systems Engineers. Check out the FAQ!
1 | initial version |
Use a for loop and perform dynamic simulations with increasing fault clearing time until instability occurs.
2 | No.2 Revision |
Use a for loop and perform dynamic simulations with increasing fault clearing time until instability occurs.
EDIT:
Critical Clearing Time (CrCT) calculation was introduced in PSSE rev 35.5.